Operating temperature, concentration window, catalyst poisoning risk, fuel use and safety interlocks compared for RTO and catalytic combustion units.
What this article covers
- Selection method for vocs treatment equipment under real plant conditions
- The parameters that decide sizing: gas volume, temperature, dust or pollutant load and the outlet limit
- Material and media choices that affect service life and running cost
- Installation, commissioning and maintenance points that are often missed in quotation stage
Get the full calculation for your site
Send air volume, dust or gas composition, temperature, required outlet value and available space. Our engineers return the sizing calculation, a configuration proposal and a budget quotation. Emission and energy results always depend on your actual operating condition and the local standard in force.
Request the calculation




