Chemical & Coking

Chemical & Coking Treatment & Conveying Configuration

Coking flue gas treatment, tar capture, VOCs recovery and corrosion-resistant dust collection.

Working condition

Typical problems in this sector

  • Coke oven gas contains tar and benzol that foul ductwork and filter media.
  • Reactor vent gas is corrosive and needs scrubbing before oxidation.
  • Organic exhaust concentration varies with batch operation.
  • Explosive atmosphere classification limits electrical equipment choice.

Recommended configuration

Stage by stage equipment selection

Each row shows the process stage, the machine we normally select and the point that decides whether it performs on site.

Recommended equipment configuration for Chemical & Coking
Process stageRecommended equipmentSelection point
Tar and heavy fraction captureWet electrostatic precipitatorGP-CDPK / GP-WESP SeriesConductive FRP or 316L construction for acid mist and tar aerosol.
Acid and alkali gas washingPP or FRP spray scrubber towerGP-PP / GP-FRP SeriesMaterial selected per chemical and temperature, pH dosing with conductivity control.
Organic exhaust oxidationRTO or catalytic combustion unitGP-RTO-2 / GP-RTO-3 ChamberHalogen and sulphur containing gas needs downstream scrubbing after oxidation.
Low concentration odourActivated carbon adsorption unitGP-AC SeriesPre-filter upstream, differential pressure monitoring for replacement timing.
Odour polishingUV photocatalytic odour purifierGP-UV SeriesUsed downstream of scrubbing or adsorption for residual low concentration odour; pre-filter required where mist is present.
Flue gas from process heatersFGD and SCR systemGP-ULE SeriesCompact layout for constrained plots, bypass damper for maintenance.

Energy

Energy saving measures for this sector

  • Heat from oxidation units can be returned to drying or preheating duties.
  • Batch operation suits VFD control on extraction fans to match production phase.

Chemical plant exhaust standards and explosion protection classification are defined by national and site regulation. Equipment selection must follow the hazard area classification of the installation point.

Related projects

Delivered in Chemical & Coking

Technical reading

Articles related to this sector

Planning a project in Chemical & Coking?

Send air volume, dust or gas data, temperature and available space. Our engineers reply with a configuration proposal and a budget quotation within 1 working day.

Usamos apenas cookies essenciais para manter este site funcionando e lembrar seu idioma e suas escolhas de consentimento. Nenhum cookie de publicidade ou rastreamento entre sites está sendo usado. Leia nossa Política de Privacidade.