GANGPUTecnología Ambiental
Aerial view of a coal fired power plant with striped stacks, cooling tower, boiler house and switchyard

Thermal Power Plant

Thermal Power Plant Treatment & Conveying Configuration

Boiler flue gas desulfurization and denitrification, fly ash collection, silo discharge and ash conveying.

Working condition

Typical problems in this sector

  • Boiler flue gas needs desulfurization and denitrification added without a long outage.
  • Fly ash from ESP hoppers leaks into the boiler house when discharge and conveying are not airtight.
  • Circulating water pumps and ID fans are oversized and throttled for most of the year.
  • Added system resistance exceeds the original fan margin after a retrofit.

Recommended configuration

Stage by stage equipment selection

Each row shows the process stage, the machine we normally select and the point that decides whether it performs on site.

Recommended equipment configuration for Thermal Power Plant
Process stageRecommended equipmentSelection point
Fly ash collectionElectrostatic precipitator, dry or wet typeGP-CDPK / GP-WESP SeriesWet ESP as a polishing stage after wet FGD for fine particles and droplets.
SO₂ removalWet limestone-gypsum desulfurization towerGP-FGD SeriesSpray layer number set by inlet SO₂, glass flake lining for chloride resistance.
NOx removalSCR reactor in high dust arrangementGP-SCR SeriesUse the existing temperature window to avoid gas reheating, catalyst layers per inlet NOx.
Ash discharge and liftingRotary airlock, drag chain conveyor, bucket elevatorGP-MS / GP-FU SeriesEnclosed casing with hardened liners, interlocked level and speed monitoring.
Auxiliary power savingMV VFD retrofit on ID fan and pumpsGP-VFD SeriesBypass cabinet keeps production running if a drive trips.

Energy

Energy saving measures for this sector

  • Sub-metering per workshop is the fastest way to find where auxiliary power is lost.
  • Closed loop control on furnace pressure and cooling water return temperature replaces manual damper setting.

Ultra-low emission requirements are defined by the local environmental authority and the plant permit. Outlet values are verified by CEMS under actual load and fuel quality.

Related projects

Delivered in Thermal Power Plant

Technical reading

Articles related to this sector

Planning a project in Thermal Power Plant?

Send air volume, dust or gas data, temperature and available space. Our engineers reply with a configuration proposal and a budget quotation within 1 working day.

Utilizamos únicamente cookies esenciales para mantener el funcionamiento de este sitio y recordar su idioma y sus preferencias de consentimiento. No se utilizan cookies publicitarias ni de seguimiento entre sitios. Lea nuestra Política de privacidad.