V/F, sensorless vector, closed loop with pressure or flow
Protection
Over current, over voltage, phase loss, over temperature, ground fault
Retrofit scope
Survey
Load profile, operating hours, throttling and valve position measurement
Design
Drive sizing, harmonic analysis, bypass and interlock scheme
Installation
Cabinet, cables, sensors, cooling and civil works
Verification
Before and after power metering with test report
Values shown are the standard manufacturing range. Final parameters are calculated from your gas volume, dust or pollutant load, temperature and the emission standard in force at your site.
Customisation options
Bypass cabinet for continuous operation during failure
Harmonic filter or multi-pulse rectifier
Remote monitoring and energy metering
Outdoor cabinet with cooling and dust protection
Export packing & delivery
Cabinets in wooden cases with shock indicators
Spare parts and documents in separate boxes
Drawings, assembly sequence, manual and test records are supplied with every shipment. On-site engineer dispatch can be arranged for complete system projects.
Tell us your plant condition, we will size the system
Send air volume, dust or gas data, temperature and available space. Our engineers reply with a configuration proposal and a budget quotation within 1 working day.
Nous utilisons uniquement des cookies essentiels pour assurer le bon fonctionnement de ce site et mémoriser votre langue ainsi que vos choix de consentement. Aucun cookie publicitaire ou de suivi inter-site n'est utilisé. Consultez notre Politique de confidentialité.