Three chamber RTO with upstream spray scrubber for a metal coating line, recovering heat back to the curing oven to cut fuel consumption.

Activated carbon adsorption and catalytic combustion unit with yellow access doors and curved inlet duct installed beside the coating plant

Original condition

The problem on site

Two spray booths and one curing oven discharged organic exhaust separately. Paint mist carried into the ductwork, the site permit required a single controlled outlet, and the oven burned natural gas continuously.

Engineering approach

What we designed and built

  1. 01Combined the three sources into one duct network with dampers so booth and oven flows can be balanced independently.
  2. 02Added a PP spray scrubber with demister upstream to remove paint mist and particles before the oxidizer.
  3. 03Selected a three chamber RTO at 45,000 m³/h to keep outlet stability during valve switching.
  4. 04Returned part of the RTO hot air to the curing oven through an insulated duct with temperature control.
  5. 05Installed LEL monitoring with automatic dilution air and bypass damper for safe operation.

Measured results

Before and after commissioning

Values recorded on this project under its own operating condition. Results at another plant depend on fuel, material, load profile and the local standard in force.

Before and after measurements for Coating Line VOCs Treatment with RTO and Scrubber
ItemBeforeAfter
Treated air volumeTwo booths vented directly45,000 m³/h combined to one RTO
Non-methane VOCs at outletAbove site permit limitWithin permit limit per site monitoring
Natural gas consumptionBaseline oven burner loadReduced by heat recovery to the curing oven
Paint mist carryoverFouling of downstream equipmentRemoved by upstream scrubber and demister

Outcome

How the system runs now

The plant now discharges through one monitored stack. Outlet non-methane VOCs measured by the site monitoring system stay within the permit limit under normal production, and part of the oven fuel demand is covered by recovered heat. Actual values depend on production mix and local regulation.

Site records

Fabrication, erection and commissioning

Activated carbon adsorption and catalytic combustion unit with yellow access doors and curved inlet duct installed beside the coating plant
Spray scrubber tower installed upstream of an RTO at a coating plant
Ceramic heat recovery media inside an RTO chamber during inspection
Heat recovery duct returning hot air from the RTO to a curing oven

Planning a similar retrofit or new build?

Send air volume, dust or gas data, temperature and available space. Our engineers reply with a configuration proposal and a budget quotation within 1 working day.

Kami hanya menggunakan cookie esensial agar situs ini berfungsi dan untuk mengingat bahasa serta pilihan persetujuan Anda. Tidak ada cookie iklan atau pelacakan lintas situs yang digunakan. Baca Kebijakan Privasi.