Each case records the original problem, the equipment configuration, the installation approach and the measured change after commissioning.

Business line
Industry

Showing 5 of 5 projects

Export shipments are handled with container loading plans, shipping marks and full document sets for customers worldwide.Discuss your project

On-site installation

Fabrication, erection and commissioning records

Workshop fabrication, module lifting, ductwork assembly, conveyor installation, electrical commissioning and export loading — the stages buyers usually ask to see.

Mobile crane lifting a large steel hopper module beside the plant building during on-site installation
Baghouse body lifting into positionSteel mill dust collection project — module lifting and alignment
Worker in red uniform grinding a curved steel duct elbow during hood and ductwork fabrication on site
Ductwork and hood fabricationWorker grinding curved duct elbow sections before hood assembly
Interior view of a large rectangular flue duct with ribbed steel wall plates before closing
Rectangular flue duct interiorRibbed wall plates of a large rectangular duct before closing on site
Welders fitting duct floor plates with the main curved flue duct and concrete stack behind at a steel plant
Flue gas duct and stack connectionMain flue duct routed into the collector structure beside the existing stack
Mobile crane erecting steel support frames beside a concrete stack and multi-storey collector structure
Collector support structure erectionMobile crane raising steel frames beside the existing stack and collector structure
Flatbed trucks loaded with cages of filter bags leaving the factory yard for export shipment
Export loading of filter bags and cagesFlatbed trucks loaded with filter cages leaving the factory for overseas shipment
Grey pyramid capture hood canopies aligned on a steel support frame above the furnace roof
Capture hood canopies on roof framePyramid capture hoods aligned on the steel frame above the furnace
Perforated steel distribution panels staged on the ground in front of the collector body and stacks
Perforated panels staged before liftingPerforated steel distribution panels laid out in front of the collector body

Ask for the closest reference project

Describe your process, capacity and the emission or energy target. We will reply with a configuration proposal and a comparable delivered case.

Prefer a direct channel? Email szamtx@163.com or scan the WhatsApp QR code in the floating button.

What a case record contains

  • Original working condition and the problem it caused
  • Equipment list with model, capacity and material
  • Installation approach and shutdown window planning
  • Measured before and after values with the test method
  • Wear parts service interval observed on site

Measured values are recorded on the specific project under its own operating condition. Results at your plant depend on fuel, material, load profile and the local standard in force.